NC
Norm Construction
AI Demo
Back to Portfolio

The Hyde Park Whole-House

Critical

3418 W Morrison Ave, Tampa, FL 33629

1935 Craftsman · PM: Marcus Rivera · 2,400 sqft

Contract Value
$287,000
Progress
55%
Schedule
12d behind
CO Exposure
$47,000

Construction Phases

Insulation & Drywall

2026-02-172026-03-14

45% completein-progress
Milestones
Spray foam insulation (exterior walls)2026-02-21
Blown-in attic insulation2026-02-24
Drywall hung (1st floor)2026-03-03
Drywall hung (2nd floor)2026-03-07
Drywall finished & sanded2026-03-14
Costs
Insulation & Drywall$9,200
Budget: $16,000
Total$9,200 / $16,000
Subcontractors
A-1 Drywall Tampa
Issues
Owner verbally directed adding board-and-batten accent wall in living room (~$2,800) during drywall (#6)

Permits

Number Type Status
BLD-2025-07156 Building Permit — Whole-House Renovation approved
PLM-2025-03845 Plumbing Permit approved
ELE-2025-05622 Electrical Permit approved
MEC-2025-03410 Mechanical Permit — HVAC approved
STR-2025-01289 Structural Permit — Foundation Repair
Supplemental structural permit for helical pier installation. Filed after foundation settling discovered. Awaiting final structural engineer sign-off on pier spacing modification.
pending

Inspections

Type Date Result
Foundation Repair
Pier spacing on NE corner insufficient per FBC §1810.3.1. Required 2 additional piers.
2025-11-14 failed
Foundation Repair (re-inspect)
Additional piers installed. Spacing now meets code.
2025-11-21 passed
Framing 2025-12-19 passed
Roof Deck / Nail Pattern 2025-12-30 passed
Plumbing Rough 2026-01-28 passed
Electrical Rough 2026-02-06 passed
HVAC Rough 2026-02-12 passed
Insulation 2026-02-24 passed
Drywall Nail 2026-03-05 scheduled

Cost Breakdown

Category Budgeted Actual Committed Variance
Design & Engineering $12,000 $12,000 $12,000 $0
Demolition $14,000 $14,000 $14,000 $0
Foundation Repair $0 $28,500 $28,500 -$28,500
Framing & Carpentry $24,000 $26,800 $26,800 -$2,800
Roofing $18,000 $17,800 $17,800 $200
Plumbing $22,000 $24,800 $24,800 -$2,800
Electrical $18,000 $19,200 $19,200 -$1,200
HVAC $16,000 $16,000 $16,000 $0
Insulation & Drywall $16,000 $9,200 $16,000 $0
Finishes (flooring, tile, cabinets, paint) $90,000 $0 $72,000 $18,000
Fixtures & Appliances $32,000 $0 $28,000 $4,000
Punch & Closeout $4,000 $0 $0 $4,000
Total $266,000 $168,300 $275,100 -$9,100

Weather Impact

Tropical Storm Milton remnants 2025-10-15

Demo paused 3 days. Tarps deployed on exposed roof areas. Crew stood down.

3d lost
Cold Front (35°F overnight) 2025-12-24

Roofing adhesive cure time extended. Half-day lost.

0.5d lost
Heavy Rain (4.1" in 6hrs) 2026-02-08

Minor water intrusion through incomplete exterior. Drying fans deployed for 2 days before insulation could proceed.

2d lost

Subcontractor Directory

Tampa Bay Demo Pros
Demolition
complete
Mike Torres
(813) 555-0142
Foundation Specialists of Tampa
Foundation Repair
complete
Jim Hartley
(813) 555-0167
Bay Area Framing
Framing
complete
Carlos Vega
(813) 555-0198
Tampa Roofing Co
Roofing
complete
Dan O'Brien
(813) 555-0334
Sunshine Plumbing
Plumbing
active
Pete Hernandez
(813) 555-0223
Gulfcoast Electric
Electrical
active
Steve Kim
(813) 555-0317
Comfort Zone HVAC
HVAC
active
Ray Nguyen
(813) 555-0478
A-1 Drywall Tampa
Drywall & Insulation
active
Juan Ramirez
(813) 555-0445
Artisan Tile Works
Tile & Stone
scheduled
Maria Santos
(813) 555-0512
Tampa Custom Cabinets
Cabinetry
scheduled
Dave Kowalski
(813) 555-0634
Back to Portfolio